Verification Queue
Verify field submissions before they are allowed to influence national status.
Pending submissions
3
Verified this session
0
Unverified asset records
7
Field submissions awaiting verification
- SUB-8801in progressTutong Town Pump Station18 min ago
Standby pump started manually. Wet well level falling slowly.
Md. Hafiz Jumat · Tutong · Sewerage · 3 photos attached (demo)
- SUB-8802in progressSeria Coastal Outfall26 min ago
Two mobile pumps in service, discharge hose secured.
Nurul Aisyah · Belait · Drainage & Flood · 4 photos attached (demo)
- SUB-8805in progressSeria Sewage Plant4 h ago
Aeration diffuser replacement 55% complete.
Md. Hafiz Jumat · Belait · Sewerage · 5 photos attached (demo)
Unverified asset records
Excluded from the AI brief until verified.
- AST-0004 Badas Trunk Main KM12Belait · Leak isolated, bypass active
- AST-0010 Seria Sewage PlantBelait · Aeration line refurbishment
- AST-0011 Tutong Town Pump StationTutong · Overflow risk, tanker standby
- AST-0016 Sungai Liang Bridge DeckBelait · Load restriction 10T
- AST-0023 Tutong Kampong Sinaut HomesTutong · Utility connection delayed
- AST-0027 Seria Coastal OutfallBelait · Tidal surge, pumps at max
- AST-0030 Muara Port Access DrainBrunei-Muara · Pump removed for overhaul