Bukit Barun Treatment Plant
AST-0001 · Brunei-Muara · Hjh. Noraini Salleh
Output 68% of design capacity
Next scheduled maintenance: routine cycle · verified record
Centralized Operational Monitoring & Intelligence System
Each module carries its own AI operational brief, attention insights and printable report.
These filters are applied automatically to the AI brief and any generated report.
No active preset — current filters apply. Presets are stored locally for this demo role and become per-user saved views once accounts are enabled.
Readiness
76%
treatment & network assets
Critical / degraded
1 / 2
Avg works progress
52%
Freshness
86%
1 stale
Grounded in 6 verified records; 1 unverified records excluded.
Server-side AI analysis
The model receives only the verified evidence lines above. The provider key stays on the server.
Module prompts
Source records
Needs attention
What changed · AI period comparison
Comparison basis: last 24 h versus the preceding 24 h (24–48 h ago); scope Water Supply · nationwide · status all · incident type all severities. Only labelled, verified demo records are used.
Recorded changes
4 vs 0 (+4)
Status escalations
2 vs 0 (+2)
Alerts raised
2 vs 0 (+2)
Critical/high alerts
1 vs 0 (+1)
Incidents opened
1 vs 0 (+1)
2 module alerts in window · source records CHG-53, CHG-55, CHG-57, CHG-60, ALR-203, ALR-206, INC-1039
Server-side AI analysis
The model receives only the verified evidence lines above. The provider key stays on the server.
The generated report automatically applies the current filters.
Files are named MOD-NOC_DEMO_RPT-9388_water_all_all_all_24h.csv and apply the same filters as the PDF.
Bukit Barun Treatment Plant
AST-0001 · Brunei-Muara · Hjh. Noraini Salleh
Output 68% of design capacity
Next scheduled maintenance: routine cycle · verified record
Layong Booster Station
AST-0002 · Brunei-Muara · Hjh. Noraini Salleh
One of two pumps isolated
Next scheduled maintenance: priority intervention · verified record
Mengkubau Reservoir
AST-0003 · Brunei-Muara · Md. Faiz Abdullah
Storage nominal
Next scheduled maintenance: routine cycle · verified record
Badas Trunk Main KM12
AST-0004 · Belait · Awg. Hakim Yusof
Leak isolated, bypass active
Next scheduled maintenance: priority intervention · awaiting supervisor verification
Kuala Belait Distribution Zone
AST-0005 · Belait · Awg. Hakim Yusof
Pressure below service level
Next scheduled maintenance: priority intervention · verified record
Tutong Water Intake
AST-0006 · Tutong · Dk. Suriani Pengiran
Turbidity within limits
Next scheduled maintenance: routine cycle · verified record
Bangar Treatment Skid
AST-0007 · Temburong · Awg. Rahman Ali
Seasonal demand normal
Next scheduled maintenance: routine cycle · verified record